Nice and Cosy

Just before the men knocked off for their well-earned Christmas and New Year break, the plumbers were busy laying the underfloor heating coils on the ground floor. It was hoped to pour the concrete covering before Christmas, but unfortunately the wild wet and windy weather made that impossible.

The stone facing on the two gable ends is well advanced as is the stonework on the first of the two dormers at the front of the building.

 