Feb 19 2014

Green becomes black

Despite the appalling weather, the slaters have managed to cover a large part of the roof with slates, quite clearly turning the green felt into black slates. The masons meanwhile have almost completed the stonework on the south wall, although they too have been held up, not so much by weather, but by the late arrival of the sandstone facings for the back door.

Slates 2

Slates 2

Slates 1

Slates 1

 

South Wall Rebuild

South Wall Rebuild

Jan 20 2014

Upstairs / Downstairs

Everyday seems to see more and more men on site -joiners, electricians, plumbers, stonemasons roofers and even the odd gopher, cleaning up after them! So there are signs of progress everywhere, to put it succinctly upstairs and downstairs! There’s even a room with a view – of Angus’s office in the garden!

First Floor takes shape - 1

First Floor takes shape – 1

First Floor takes shape - 2

First Floor takes shape – 2

Underfloor Heating sealed

Underfloor Heating sealed

Garden view from First Floor

Garden view from First Floor

Jan 19 2014

Goings on in the bedroom

Well work recommenced on the 6th. January and it is plain that the lads were all well rested as they set to with gusto, ousting poor Angus and Frances from their cosy master bedroom and proceeding to demolish it! I’m sure it will all turn out for the best in the end, but right now it is starting to look much as it did, when Henrietta and I renovated the Lodge in 1992.
So that you can understand what I mean, I attach photos of the bedroom taken then and photos taken today.

 

Master Bedroom 2 - 1992

Master Bedroom 2 – 1992

Master Bedroom 1 - 1992

Master Bedroom 1 – 1992

 

Master Bedroom 1 - 2014

Master Bedroom 1 – 2014

Master Bedroom 2 - 2014

Master Bedroom 2 – 2014

Jan 05 2014

Nice and Cosy

Just before the men knocked off for their well-earned Christmas and New Year break, the plumbers were busy laying the underfloor heating coils on the ground floor. It was hoped to pour the concrete covering before Christmas, but unfortunately the wild wet and windy weather made that impossible.

The stone facing on the two gable ends is well advanced as is the stonework on the first of the two dormers at the front of the building.

 

Underfloor Heating 2

Underfloor Heating 2

Underfloor Heating 1

Underfloor Heating 1

Gable Stonework

Gable Stonework

Dormer Stonework

Dormer Stonework

Dec 14 2013

The Greening of Glenlair

Now plainly visible as you drive past the farm on the B794 going to/from Corsock, thanks to the newly felted green roofs. The window openings have been sealed with polythene and to all extents and purposes, the building is now wind and watertight.

Front

Front

Back

Back

Dec 12 2013

A Cat’s Cradle and the re-birth of the bay window

A forest of roof trusses makes the Cat’s Cradle and one can only wonder what it will be like crawling around there tracing leaks or running cables – ah well they’re young!

The Bay window at the rear of the house which was partially dismantled whilst stabilising the building in 2005 has been restored and the bottom sill lowered in order to make a French window opening into the back garden. Unfortunately because of all the scaffolding still in place, it is a little difficult to see clearly just what’s been done.

Lintel Removal Dec 2008

Lintel Removal Dec 2008

Bay Window stabilisation Dec 2008

Bay Window stabilisation Dec 2008

Sandstone stored for future use Dec 2008

Sandstone stored for future use Dec 2008

Lintel Back in place Dec 2013

Lintel Back in place Dec 2013

Binky proudly shows off lower sill

Binky proudly shows off lower sill

Cat's Cradle

Cat’s Cradle

Dec 03 2013

Amazing what you can do with a flat-pack

Suddenly a transformation is taking place as the flat packs are dismantled and become floors, walls and even the roof. Mind you all this is only possible with the right tools to do the job – screwdrivers and the odd shifting spanner are definitely not up to the job – you definitely need the most enormous crane and a nail-gun or two!

Roof takes shape

Roof takes shape

Enormous Crane

Enormous Crane

 

Walls and floors

Walls and floors

On the roof

On the roof

 

Nov 08 2013

Opening the Time Capsule

Well at last we summoned up the courage to open the Time Capsule and as we were looking for nimble steady hands, Angus was duly elected to do the business! On went a pair of pristine white gloves; a nice clean tablecloth on the table and off we went…!

First the wax sealer around the neck of the jar had to be prised loose, before the glass stopper could be attacked. The stopper appeared to be stuck, and we assumed by wax, so a hair dryer was purloined and finally with the blade of a knife, the stopper came away. Immediately, on inverting the jar a roll of paper tied with string fell out, followed by a rather odd smelling cork and then two fairly heavy packages with paper wrapping, sealed with embossed wax seals. This left rolls of paper, some of which was quite clearly a newspaper. The neck of the jar being narrower than the base, it was necessary to carefully wind tight the rolls of paper so that they could be withdrawn through the mouth of the jar. It was with some trepidation that Angus, gently did so, and wonders of wonders, first the newspaper then finally the hand drawn plans for the house were withdrawn from the jar. The newspaper was the 19 March edition of the Edinburgh Evening Post of 1831 and was in remarkably good condition.

That being enough stress for one evening, it was decided to halt proceedings at that point and leave the unravelling of the paper roll and the opening of the two mysterious packages until a later date.

 

Opening the Time Capsule

Opening the Time Capsule

Wax Removed

Wax Removed

First objet d'art

First objet d’art

Top removed

Top removed

2 Packets with wax seals

2 Packets with wax seals

Removing the newspaper

Removing the newspaper

The Edinburgh Post

The Edinburgh Post

Detailed plans of Glenlair House

Detailed plans of Glenlair House

 

 

 

 

 

 

 

 

 

 

 

 

 

Nov 02 2013

‘IKEA’ flat-pack arrives

Yesterday, a massive articulated lorry, far too big to come up the drive, unceremoniously dumped enormous lengths of timber at the road-end. Panic set in, but our trusty old Massey-Ferguson 240 and Graham’s Manitou successfully picked up the pieces and transported them up to the site. Foreman Gordon was somewhat surprised to find himself driving a 30 year-old tractor – more because it still worked than anything else!

Meanwhile the scaffolders have been busy and scaffolding surrounds the whole building.

IKEA Flatpack arrives

‘IKEA’ Flatpack arrives

 

Fully scaffolded - front

Fully scaffolded – front

Fully scaffolded - rear

Fully scaffolded – rear

Oct 25 2013

Concrete base floor is laid

Four large lorry loads of cement and a transformation takes place within the building shell. Tons of breezeblocks have also been delivered and very soon the central partition wall and the end wall will start to rise from the rubble. Unfortunately the weather has broken and rain is the order of the day.

Cement arrives

Cement arrives

Laying the concrete base floor

Laying the concrete base floor

Piles of Breezeblock and Stone

Piles of Breezeblock and Stone